3.3 KiB
Queued Gate1 validity correction
Read-only Stage evidence (2026-10-24)
Task 565ace1f-8cfc-4447-b978-66c36e7b767b: READY, version 4, PREPARE/STAGE_PREPARE, proposer pmo. Approval 30f8ce5c-ce00-4885-8eea-3c1bb5a7e8b0: gate 1 APPROVED by independent actor 4a0afc72-0fd4-4d76-825b-aea13f00e880, created 05:37:54.808Z, expires 06:37:00Z. runId/artifactHash/commitSha/environment on that Gate1 decision are null (normal Gate1 task binding, not Gate2 binding). Recovery event sequence 4 queued the valid approval at 06:22:06.891Z; outbox PENDING, attempts 0, runId null, notBefore null. At 09:15Z it was truly expired. Editorial claim queries newest decision for this task/gate, not a version-specific approval; it correctly rejects it. No evidence of a binding/version mismatch.
Behavior
Persisted state remains READY; separate displayState reports blocked/renewal-required on reads. No approval is extended automatically. Existing independent reviewer authorization and task row lock protect a new ordinary Gate1 APPROVED decision. Renewal is limited to READY with a latest expired independent APPROVED decision and an unstarted PENDING outbox. It appends a decision and PREPARE_GATE1_RENEWED event, increments task version, preserves task scope/commit/budget and the existing outbox/notBefore. It rejects scheduling changes, active/attempted execution, valid approvals and self-review. Claim logic and its kill/budget/lease checks remain unchanged.
Owner steps after parent CI integration
- Sign in normally as an independent SUPER_ADMIN (or existing provisioned canonical owner reviewer); do not use worker identity or impersonation.
- Open orchestration, refresh server state, find this same task in owner decisions marked
مسدود — تأیید Gate1 منقضی شده؛ نیازمند تأیید مجدد مالک. - Review immutable scope, acceptance criteria, commit, environment and 20-cent budget; open ordinary Gate1 approval. Confirm bounded work explicitly. Renewal keeps the previous schedule; no new scheduled-start input is shown.
- Confirm once. The existing POST
/api/admin/orchestration/tasks/565ace1f-8cfc-4447-b978-66c36e7b767b/gates/1/decideuses{decision:"APPROVED",expectedVersion:4,idempotencyKey:<fresh unique key>}(use refreshed version if changed). Notes optional; omit expiresAt for backend 24-hour validity. Retry only the identical payload/key after an ambiguous response; 409 requires refresh. - Verify new independent decision, PREPARE_GATE1_RENEWED event and version increment. Do not recreate task or enqueue another outbox. Parent performs separately authorized runner/live acceptance.
Verification
Frozen 09:15Z regression observed RED before implementation for READY representation and ordinary renewal; editorial exact 403/read mismatch observed RED; UI owner queue observed RED. GREEN: 41 backend scoped tests, 25 admin scoped tests. Disposable PostgreSQL test passes real simultaneous renewal/replay and claim serialization, expired denial, immutable old approval retention, one outbox/one claim. Backend build, Prisma client generation, admin build and application TypeScript check passed in Node22 with private donor dependencies. Initial build permission/stale-generated-client setup failures corrected only in private worktree copies. No Stage/Production DB mutation, approval, runner invocation, push or deploy.